Concrete for concreting one fence post - manual drilling
Concrete required for concreting one post of the fence - the post is not filled in its entirety

Product description
For manual drilling, we consider a drilled hole diameter of 25 cm and a depth of 60 cm for installing the post.
The concrete is prepared on-site by our workers using cement, water, and gravel. Using ready-mix concrete from a batching plant is not possible, as the posts are concreted gradually. We kindly ask you to arrange for gravel from the nearest supplier at our expense. Cement, a concrete mixer, and other tools will be brought by our workers.
The customer will be required to provide an electrical connection for the concrete mixer and a water supply.
Discussion
Product question

5 € Before discount: 5 €
6,15 € incl. VAT